What a difference a month can make. This week the new fascia boards and roof were completed. Just in case anyone out there needs the specifics, we went with a combed finish on the fascias (supposed to resist the paint from peeling off in the future), and a 30-year architectural finish asphalt roof with high-profile ridge caps, a ridge vent in the top of the roof (instead of those ugly black box vents) and zinc strips up the ying-yang to stop the mold from clinging on.
Whew.
Next up, we're painting the siding, trim and soffits, and trying to take advantage of the sunny early fall days. (That's a nice way of saying we're neglecting work on the inside of the house right now.)